Dare to Prepare
Earthquake Readiness Campaign

Join Us!

The Great Southern California ShakeOut



Why Prepare Now?

Secure Your Stuff

Secure Your Building

Seven Steps to Safety

Other languages

Featured Resources

Calendar

News

Campaign Overview

Contact Us!





Disclaimer: The effects, descriptions, recommendations, and suggestions included in this web site are intended to improve earthquake preparedness; however, they do not guarantee the safety of an individual or a structure. The Earthquake Country Alliance (ECA) takes responsibility for the inclusion of materials from various sources on these pages. The State of California, the Seismic Safety Commission, the ECA and all contributors to this document do not assume liability for any injury, death, property damage, loss of revenue, or any other effect of an earthquake.




Rooftop Mechanical Units

Larger imageMechanical Units with Blocking and Clips on a Wood Roof

Source: Noson, Perbix, SSD

Purpose

To secure rooftop mechanical units.

Caution

When anchoring to post-tensioned slab, locate and avoid reinforcing.

Recommendation

Install clips and blocking.

Supplies Required

  • Clips, Z and L—1/8" thick
  • Lag bolts—3/8" diameter (for wood)
  • Sheet metal screws—No. 10 x 3/4" (for steel)
  • 4x blocking (for wood)
  • Blocking—L2 x 2 x 3/8" (for steel)
  • Drive pins
  • Framing clips (for wood) Simpson A35

Installation

To install blocking and clips for a wood roof, follow these steps:

  1. Insert 4x blocking between existing joists with framing clips.
  2. Attach Z or L clip to mechanical unit with corresponding fasteners and attach to blocking. Place clips at 24" on center minimum.
  3. Patch roof as required.

Larger imageMechanical Units with Blocking and Clips on a Steel Roof

Source: Noson, Perbix, SSD

To install blocking and clips for a steel roof, follow these steps:

  1. Insert blocking between existing joists and weld in place.
  2. Attach Z or L clip as mechanical unit with corresponding fasteners and attach to blocking. Position clips at 24" on center minimum.
  3. Patch roof as required.


Source: School Facilities Manual Nonstructural Protection Guide